LIGNUM – Holzwirtschaft Schweiz | Economie suisse du bois | Economia svizzera del legno
Mühlebachstrasse 8 | 8008 Zürich | Tel. 044 267 47 77 | Fax 044 267 47 87 | info@lignum.ch

> Printversion

Components

Construction assembly A2702

Lignum ID-№
A2702
Catalog number
A.2.03.4228
Source of construction assembly
Lignatur, Year 2020
Base structure
Hollow box element
Paneling
Without covering
Reference fire protection
VKF Brandschutzanwendung Nr. 15421
Construction height
330 mm
Weight
314 kg/m2
U-value
≈ 0.340 W/m2K
GWP
0.00 kg CO2-eq/m2
Type sound insulation
Measurement
Ceiling consisting of a basic construction of hollow box element, without sheathing, without ceiling covering, with dampening in supporting structure, without cavity insulation in the supporting structure. Without dampening on the supporting structure, with impact sound insulation with a dynamic stiffness [s'] of 15 MN/m³ and with dry screed.
Values of airborne sound insulation
Rw 72 dB
C -3 dB
C50-3150 -7 dB
Values of footfall sound insulation
Ln,w 45 dB
CI -1 dB
CI50-2500 3 dB

Graphic

Flooring: GIFAfloor FHBplus Klima
Separating layer: TS silent
On-lying material: Garden plates
Sub-floor: Lignatur surface element sheathing above
Dampening in supporting structure: Damper and limestone granules LFE silence12

Assembly

Layer Product Manufacturer Thickness [mm] Weight Width (b) Axial distance (e) KBOB ID-№ Production KBOB ID-№ Disposal
Flooring GIFAfloor FHBplus Klima Knauf 38 mm 57 kg/m2 - - 03.007 91.063
Separating layer TS silent Lewis Spillner Spezialbaustoffe 2.8 mm 3.1 kg/m2 - - 08.003 91.146
On-lying material Garden plates Generic product 60 mm 144 kg/m2 - - 02.007 91.136
Sub-floor Lignatur surface element sheathing above Lignatur 31 mm 14.6 kg/m2 - - 07.011.01 91.052
Dampening in supporting structure Damper and limestone granules LFE silence12 Lignatur 88 mm 77.8 kg/m2 - - 03.011 91.062

Values by frequency

Color Type 25 32 40 50 63 80 100 125 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 3150 4000 5000
Airborne sound (R) Measurement LSW Stephanskirchen bei Rosenheim 32 34 40 48 49 51 60 63 65 68 70 72 73 77 81 82 85 84 86 88 85
Calculation Lignum/Kühn and Blickle 17 20 22 25 28 30 32 31 34 37 40 42 45 47 48 47 48 57 65 72 81 89
Impact sound (Ln) Measurement LSW Stephanskirchen bei Rosenheim 59 57 51 50 50 49 47 47 48 48 51 51 49 43 39 37 34 28 23 15 10
Calculation Lignum/Kühn and Blickle 64 64 65 65 65 66 67 71 71 71 71 72 72 73 75 79 81 75 70 66 60 54

Airborne sound (R)

Loading...

Impact sound (Ln)

Loading...

Ecological indicators according to KBOB Ökobilanzdaten im Baubereich
(Manufacture and disposal, without considering the payback periods according to SIA 2032)

bSDD Properties
mm Indicators Modules
Values / m2
+
Environmental impact points (UBP)
0
UBP'21/m2
A1-A3 + C1-C4
 
Environmental impact points from production (UBP_pro)
0
UBP'21/m2
A1-A3
 
Environmental impact points from disposal (UBP_dis)
0
UBP'21/m2
C1-C4
+
Total primary energy (PE_T)
0
kWh oil-eq/m2
A1-A3 + C1-C4
 
Primary energy from production (PE_pro)
0
kWh oil-eq/m2
A1-A3
 
Primary energy production, energetically consumed (PE_E_pro)
0
kWh oil-eq/m2
A1-A3
 
Primary energy production, materially bound (PE_M_pro)
0
kWh oil-eq/m2
A1-A3
 
Primary energy from disposal (PE_dis)
0
kWh oil-eq/m2
C1-C4
+
Renewable primary energy (PE_RT)
0
kWh oil-eq/m2
A1-A3 + C1-C4
 
Renewable primary energy from production (PE_RT_pro)
0
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from generation, energetically consumed (PE_RE_pro)
0
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from production, materially bound (PE_RM_pro)
0
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from disposal (PE_RT_dis)
0
kWh oil-eq/m2
C1-C4
+
Total use of non- renewable primary energy resources (PE_NRT)
0
kWh oil-eq/m2
A1-A3 + C1-C4
 
Primary energy not renewable from manufacturing (PE_NRT_pro)
0
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from production, energetically consumed (PE_NRE_pro)
0
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from production, materially bound (PE_NRM_pro)
0
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from disposal (PE_NRT_dis)
0
kWh oil-eq/m2
C1-C4
+
Total greenhouse gas emissions (GWP_total)
0
kg CO2/m2
A1-A3 + C1-C4
 
Greenhouse gas emissions from manufacturing (GWP_pro)
0
kg CO2/m2
A1-A3
 
Greenhouse gas emissions from waste disposal (GWP_dis)
0
kg CO2/m2
C1-C4
 
Biogenic carbon dioxide storage (bio-C x 44/12 = bio-CO2) (Not included in GWP)
0
kg CO2/m2
B1-B7
 
Biogenic carbon storage (bio-C) (Not included in GWP)
0
kg C/m2
B1-B7
⇒ Advantages of the life cycle assessment outside the system boundary (module D)