Components

Construction assembly A0318

Lignum ID-№
A0318
Catalog number
A.2.02.E11
Source of construction assembly
Lignum, Year 2016
Base structure
Hollow box element
Paneling
Substructure with rubber-mounted hangers
Reference fire protection
Lignum Dok. 4.1 / Tabelle: 433
Construction height
465 mm
Weight
397 kg/m2
U-value
≈ 0.282 W/m2K
GWP
51.90 kg CO2-eq/m2
Type sound insulation
Verified calculation
Ceiling consisting of a basic construction of hollow box element, without sheathing, simple ceiling covering. Substructure mounted with flexible hangers with cavity insulation with air flow resistivity [r] of 5≤ r ≤35 kPa s/m², without dampening in the supporting structure, with cavity insulation in the supporting structure. Without dampening on the supporting structure, with impact sound insulation with a dynamic stiffness [s'] of 6 MN/m³ and with cement screed.
Values of airborne sound insulation
Rw 63 dB
C -7 dB
C50-3150 -11 dB
Values of footfall sound insulation
Ln,w 52 dB
CI 4 dB
CI50-2500 9 dB

Graphic

On-lying material: Cement screed
Sub-floor: Multilayer solid wood panels, engineered wood panel ≥ 450 kg/m³
Bond: Rigid, execution of the prior art.
Cavity dampening: Fiber insulation with 5≤ r ≤35 [kPa*s/m²
Bond: Rigid, execution of the prior art.
Lower skin layer 1: Multilayer solid wood panels, engineered wood panel ≥ 450 kg/m³
Coupling: Rubber mounted direct hanger b=60mm
Battens / profiles: Wood lath b=60mm
Cavity dampening: Fiber insulation with 5≤ r ≤35 [kPa*s/m²
Ceiling covering 1st layer: Gypsum fiber or hard gypsum board ≥ 1000kg/m³
Surface / treatment: Glued joints/smoothed

Assembly

Layer Product Manufacturer Thickness [mm] Weight Width (b) Axial distance (e) KBOB ID-№ Production KBOB ID-№ Disposal
On-lying material Cement screed Generic product 80 mm 176 kg/m2 - - 04.006 91.136
Sub-floor Multilayer solid wood panels, engineered wood panel ≥ 450 kg/m³ Willisauerstrasse 37, Pius Schuler, Stora Enso, Binderholz, Novatop, Pfleiderer, Schilliger Holz 25 mm 11.8 kg/m2 - - 07.001 91.048
Bond Rigid, execution of the prior art. - - - - - - -
Cavity dampening Fiber insulation with 5≤ r ≤35 [kPa*s/m² Flumroc, Isover, Sager, Swisspor, Gutex, Isofloc, Schilliger Holz 160 mm 4.5 kg/m2 - - 10.008 91.173
Bond Rigid, execution of the prior art. - - - - - - -
Lower skin layer 1 Multilayer solid wood panels, engineered wood panel ≥ 450 kg/m³ Willisauerstrasse 37, Pius Schuler, Stora Enso, Binderholz, Novatop, Pfleiderer, Schilliger Holz 25 mm 11.8 kg/m2 - - 07.001 91.048
Coupling Rubber mounted direct hanger b=60mm Ampack, Fermacell, Knauf, Rigips, Protektor 20 mm 157 kg/m2 - 834 mm - -
Battens / profiles Wood lath b=60mm Generic product, Origin mark Swiss wood 30 mm 1.8 kg/m2 60 mm 500 mm 07.011 91.052
Cavity dampening Fiber insulation with 5≤ r ≤35 [kPa*s/m² Flumroc, Isover, Sager, Swisspor, Gutex, Isofloc, Schilliger Holz 30 mm 1 kg/m2 - - 10.008 91.173
Ceiling covering 1st layer Gypsum fiber or hard gypsum board ≥ 1000kg/m³ Fermacell, Knauf, Rigips 15 mm 16 kg/m2 - - 03.007 91.063
Surface / treatment Glued joints/smoothed Fermacell, Knauf, Rigips - - - - - -

Ecological indicators according to the KBOB life cycle assessment data in the construction sector KBOB / ecobau / IPB 2009/1:2022, Version 6
(For the life cycle phases production and disposal, excluding the construction phase (Modules A4, A5) and the use phase (Module B), especially replacement (Module B4) or amortization periods according to SIA 2032)

bSDD Properties
mm Indicators Modules
Values / m2
+
Environmental impact points (UBP)
96654
UBP'21/m2
A1-A3 + C1-C4
 
Environmental impact points from production (UBP_pro)
83951
UBP'21/m2
A1-A3
 
Environmental impact points from disposal (UBP_dis)
12627
UBP'21/m2
C1-C4
+
Total primary energy (PE_T)
644.50
kWh oil-eq/m2
A1-A3 + C1-C4
 
Primary energy from production (PE_pro)
628.40
kWh oil-eq/m2
A1-A3
 
Primary energy production, energetically consumed (PE_E_pro)
419.00
kWh oil-eq/m2
A1-A3
 
Primary energy production, materially bound (PE_M_pro)
211.50
kWh oil-eq/m2
A1-A3
 
Primary energy from disposal (PE_dis)
16.00
kWh oil-eq/m2
C1-C4
+
Renewable primary energy (PE_RT)
466.00
kWh oil-eq/m2
A1-A3 + C1-C4
 
Renewable primary energy from production (PE_RT_pro)
465.30
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from generation, energetically consumed (PE_RE_pro)
262.00
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from production, materially bound (PE_RM_pro)
202.20
kWh oil-eq/m2
A1-A3
 
Renewable primary energy from disposal (PE_RT_dis)
0.80
kWh oil-eq/m2
C1-C4
+
Total use of non- renewable primary energy resources (PE_NRT)
180.30
kWh oil-eq/m2
A1-A3 + C1-C4
 
Primary energy not renewable from manufacturing (PE_NRT_pro)
165.20
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from production, energetically consumed (PE_NRE_pro)
156.00
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from production, materially bound (PE_NRM_pro)
9.20
kWh oil-eq/m2
A1-A3
 
Primary energy not renewable from disposal (PE_NRT_dis)
15.20
kWh oil-eq/m2
C1-C4
+
Total greenhouse gas emissions (GWP_total)
51.90
kg CO2/m2
A1-A3 + C1-C4
 
Greenhouse gas emissions from manufacturing (GWP_pro)
46.70
kg CO2/m2
A1-A3
 
Greenhouse gas emissions from waste disposal (GWP_dis)
5.10
kg CO2/m2
C1-C4
 
Biogenic carbon dioxide storage (bio-C x 44/12 = bio-CO2) (Not included in GWP)
67.47
kg CO2/m2
B1-B7
 
Biogenic carbon storage (bio-C) (Not included in GWP)
18.40
kg C/m2
B1-B7
⇒ Advantages of the life cycle assessment outside the system boundary (module D)